- HIERRO BRONCEADO
- PREMIUM
- 40 mm
ESPUMA POLIURET. X 750ML
1 × $ 12.848,14
ALAMBRE 0.9MM X 15KG. INDURA
1 × $ 64.282,98
ELECTRODO RMB RUMBOS 6013 X 2.50MM
1 × $ 5.395,74
ANAFE ELECTRICO 1 HORNALLA (F.G.P.)
1 × $ 48.809,19
ALAMBRE 0.6MM - ROLLO 5KG RMB
1 × $ 54.235,18
ANAFE INDUSTRIAL JARSE 1H 10000 C/H
1 × $ 121.843,45
CORTE NORTON 115X3.0X22 BDA32
2 × $ 2.560,00
ELECTROBOMBA LEO CENTRIF. 1HP-220V.
1 × $ 309.042,13
CORTE NORTON 115X1.0X22 BNA12
1 × $ 1.648,00 Subtotal: $ 623.224,81
ESPUMA POLIURET. X 750ML
1 × $ 12.848,14
ALAMBRE 0.9MM X 15KG. INDURA
1 × $ 64.282,98
ELECTRODO RMB RUMBOS 6013 X 2.50MM
1 × $ 5.395,74
ANAFE ELECTRICO 1 HORNALLA (F.G.P.)
1 × $ 48.809,19
ALAMBRE 0.6MM - ROLLO 5KG RMB
1 × $ 54.235,18
ANAFE INDUSTRIAL JARSE 1H 10000 C/H
1 × $ 121.843,45
CORTE NORTON 115X3.0X22 BDA32
2 × $ 2.560,00
ELECTROBOMBA LEO CENTRIF. 1HP-220V.
1 × $ 309.042,13
CORTE NORTON 115X1.0X22 BNA12
1 × $ 1.648,00 Subtotal: $ 623.224,81
$ 3.900,00
121 disponibles
Crédito sujeto a aprobación.
¿Tienes dudas? Consulta nuestra Ayuda.
| Peso | 1 kg |
|---|---|
| Dimensiones | 10 × 10 × 10 cm |
Alambres para soldar
Alambres para soldar
Escribinos!
