- Encastre: 1/4″
- Medidas: E4 – E5 – E6 – E7 – E8 – E10 – E11
- Largo: 25 mm
- Incluye soporte para tubos metálicos
CORTE NORTON 115X1.0X22 BNA12
3 × $ 1.650,00
ANAFE INDUSTRIAL JARSE 1H 10000 C/H
1 × $ 121.843,45
ESPUMA POLIURET. X 500ML
2 × $ 10.900,00
PISTOLA MAER 454 HVLP -1.4MM C/MANO
1 × $ 572.873,54
ALAMBRE 0.6MM - ROLLO 5KG RMB
1 × $ 54.857,73
CORTE NORTON 230X3.0X22 BDA32
5 × $ 6.690,13
ALAMBRE TUB. S/GAS FLUX 0.8 X 1.0KG
1 × $ 9.656,43
ESPUMA POLIURET. X 750ML
1 × $ 12.848,14
ELECTRODO RMB RUMBOS 6013 X 2.50MM
1 × $ 5.457,67
PISTOLA MAER 658 JAGUAR
1 × $ 586.679,51
ANAFE ELECTRICO 1 HORNALLA (F.G.P.)
2 × $ 48.809,19
ELECTRODO RMB RUMBOS 6013 X 3.25MM
3 × $ 5.075,22
ALAMBRE TUB. S/GAS FLUX 0.8 X 5KG
1 × $ 41.821,68
ALAMBRE TUB. S/GAS E71T 1.2 X 4.5KG
1 × $ 86.764,49 Subtotal: $ 1.665.847,33
CORTE NORTON 115X1.0X22 BNA12
3 × $ 1.650,00
ANAFE INDUSTRIAL JARSE 1H 10000 C/H
1 × $ 121.843,45
ESPUMA POLIURET. X 500ML
2 × $ 10.900,00
PISTOLA MAER 454 HVLP -1.4MM C/MANO
1 × $ 572.873,54
ALAMBRE 0.6MM - ROLLO 5KG RMB
1 × $ 54.857,73
CORTE NORTON 230X3.0X22 BDA32
5 × $ 6.690,13
ALAMBRE TUB. S/GAS FLUX 0.8 X 1.0KG
1 × $ 9.656,43
ESPUMA POLIURET. X 750ML
1 × $ 12.848,14
ELECTRODO RMB RUMBOS 6013 X 2.50MM
1 × $ 5.457,67
PISTOLA MAER 658 JAGUAR
1 × $ 586.679,51
ANAFE ELECTRICO 1 HORNALLA (F.G.P.)
2 × $ 48.809,19
ELECTRODO RMB RUMBOS 6013 X 3.25MM
3 × $ 5.075,22
ALAMBRE TUB. S/GAS FLUX 0.8 X 5KG
1 × $ 41.821,68
ALAMBRE TUB. S/GAS E71T 1.2 X 4.5KG
1 × $ 86.764,49 Subtotal: $ 1.665.847,33
| Peso | 1 kg |
|---|---|
| Dimensiones | 25 × 5 × 5 cm |
Escribinos!
