| Peso | 1 kg |
|---|---|
| Dimensiones | 20 × 20 × 20 cm |
ESPUMA POLIURET. X 500ML
3 × $ 10.900,00
ANAFE ELECTRICO 1 HORNALLA (F.G.P.)
2 × $ 48.809,19
CORTE NORTON 115X0.8X22 NORSPEED
1 × $ 4.290,00
ELECTRODO RMB RUMBOS 6013 X 2.50MM
1 × $ 5.457,67
ALAMBRE TUB. S/GAS FLUX 0.8 X 1.0KG
1 × $ 9.656,43 Subtotal: $ 149.722,48
ESPUMA POLIURET. X 500ML
3 × $ 10.900,00
ANAFE ELECTRICO 1 HORNALLA (F.G.P.)
2 × $ 48.809,19
CORTE NORTON 115X0.8X22 NORSPEED
1 × $ 4.290,00
ELECTRODO RMB RUMBOS 6013 X 2.50MM
1 × $ 5.457,67
ALAMBRE TUB. S/GAS FLUX 0.8 X 1.0KG
1 × $ 9.656,43 Subtotal: $ 149.722,48
| Peso | 1 kg |
|---|---|
| Dimensiones | 20 × 20 × 20 cm |
Escribinos!
