| Peso | 1 kg |
|---|---|
| Dimensiones | 20 × 20 × 5 cm |
ELECTRODO RMB RUMBOS 6013 X 2.50MM
1 × $ 5.421,24
CORTE NORTON 115X1.0X22 BNA12
1 × $ 1.648,00
ALAMBRE TUB. S/GAS E71T 1.2 X 4.5KG
1 × $ 86.764,49
ALAMBRE 1.2MM X 15KG. INDURA
1 × $ 60.989,46 Subtotal: $ 154.823,19
ELECTRODO RMB RUMBOS 6013 X 2.50MM
1 × $ 5.421,24
CORTE NORTON 115X1.0X22 BNA12
1 × $ 1.648,00
ALAMBRE TUB. S/GAS E71T 1.2 X 4.5KG
1 × $ 86.764,49
ALAMBRE 1.2MM X 15KG. INDURA
1 × $ 60.989,46 Subtotal: $ 154.823,19
| Peso | 1 kg |
|---|---|
| Dimensiones | 20 × 20 × 5 cm |
Escribinos!
